SOP-MECH-017
REV 3.2
MECHANICAL PRECISION & ALIGNMENT
THE TROPICAL FOUNDATION RISK
0.01mm
In humid environments, concrete absorbs moisture and undergoes thermal cycles. This causes "Micro-Movements" where a unit aligned in January may be 0.15mm off by July.
THE 6-MONTH RULE
Mandatory laser alignment verification every 180 days. Do not assume any foundation is static.
LABYRINTH CLEARANCE PROTOCOL
PREPARATION & ACCESS
- Lock Out Tag Out (LOTO) unit; drain entire spiral case.
- Mark 8 points clockwise (Top, Bottom, L, R, diagonals).
- Use Feeler Gauges (0.05mm - 1.00mm) for 'Snug Fit'.
DEVIATION LIMITS
- Uniformity Tolerance: < 10% variance
- Minimum Safe Gap: 0.20 mm
- Seizure Danger: < 0.15 mm
SHAFT RUN-OUT (TIR) CHECK
METHODOLOGY
- Polish shaft section near bearing journal (remove rust/oil).
- Mount Magnetic DTI Base on a fixed, non-vibrating housing.
- Pre-load indicator plunger by 2.00mm; Zero the bezel.
- Rotate shaft manually at slow constant speed.
TOTAL INDICATOR READING
PASS LIMIT: ≤ 0.05
mm
Any systematic 'wobble' beyond this indicates a bent shaft or coupling misalignment.
MANDATORY PRECISION TOOLING
| TOOL | SPECIFICATION | APPLICATION |
|---|---|---|
| Dial Test Indicator (DTI) | 0.01mm Precision / Plunger Type | Shaft Run-out & Coupling Alignment. |
| Precision Feeler Gauges | 0.05mm increments / 200mm+ length | Labyrinth & Bearing clearance checks. |
| Micrometer Set | 0-150mm / Outside & Inside | Shaft diameter & housing verification. |